PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Poured concrete at Foundation walls and footings at column line 6.5 (G-C.7) Facing East (800x600).jpg Bolting Derrick -3 Facing East (800x600).jpg Derrick -3 Facing North (800x600).jpg Erecting Derrick -3 Facing East (800x600).jpg Poured concrete at Foundation walls and footings at column line 6.5 (G-C.7) Facing North-East (800x600).jpg
Previous page Poured concrete at Foundation walls and footings at column line 6.5 (G-C.7) Facing North-East (800x600)
Poured concrete at Foundation walls and footings at column line 6.5 (G-C.7) Facing North-East (800x600)